Chlorine decay occurs as water flows through the distribution network due to several factors, which are associated with chlorine reactions in the bulk of the water, walls of the pipe and storage facilities. Generally, chlorine decay in the bulk of water depends on the quality of water in the distribution network.

How is chlorine demand calculated?

In this “APHA Method”, the chlorine demand is calculated by subtracting the residual chlorine concentration from the concentration of chlorine dosed, after correction for blanks. The chlorine demand obtained in this way must be quoted for a given chlorine dose, contact time, temperature and sample pH.

What is chlorine demand?

Chlorine demand is the difference between the amount of chlorine added to water or wastewater and the amount of residual chlorine remaining after a given contact time. Chlorine demand may change with dosage, time, temperature, pH, and nature and amount of the impurities in the water.

How is chlorine contact time calculated?

This value is commonly referred to as “CT”. To calculate CT, multiply the free chlorine residual concentration (C) measured at the end of the contact time by the time (T) the water is in contact with free chlorine. To get the required CT value of 6, adjust the free chlorine residual concentration or the contact time.

Does chlorine decompose?

Chlorine is very unstable and reacts with a variety of chemicals and water when it is released into the environment. Chlorine is broken down by sunlight within a matter of several minutes.

How fast does chlorine decay?

An average value of the chlorine bulk decay constant of 0.154 h−1 was obtained.

How much concentration is needed for chlorine?

Strong or mild chlorine solutions can be prepared from a number of different types of available products. To be effective, a solution with concentration that contains either 0.5%-0.6% (5000-6000 ppm) or 0.05-0.06% (500-600 ppm) of available chlorine, depending on its intended use, is required for infection control.

How do you calculate chlorine ppm?

Parts per million (ppm) is calculated by weight. One ppm is equal to 1 pound of chlorine in 1 million pounds of water. One million pounds of water is approximately 120,000 gallons. Converting to ounces, (1 pound = 16 ounces) 1 ounce of chlorine in 7,500 gallons equals 1 ppm.

How does pH affect chlorine demand?

As pH increases, the chemical reactivity of chlorine decreases; as temperature increases, reactions proceed more rapidly.

What is free chlorine ppm?

In ANSI 1, the levels should meet the following standards: free chlorine levels should be between 1.0 and 10.0 parts per million (ppm) with bromine levels between 2.0 and 10.0 ppm.

How does chlorine concentration affect contact time?

A long interaction between chlorine and the microorganisms results in an effective disinfection process. The contact time varies with chlorine concentration, the type of pathogens present, pH, and temperature of the water.

What is breakpoint of chlorination?

Breakpoint chlorination is a technique used to remove combined chlorine by adding free available chlorine. To reach breakpoint, sufficient chlorine must be added to the pool to raise the free available chlorine level to 10 times the amount of combined chlorine.

Does chlorine break down over time?

Liquid chlorine (sodium hypochlorite) is the most unstable pool chemical, losing 50% of its potency within the first six months and 90% after a year; when exposed to extremely hot or cold temperatures, or sunlight, it degrades even faster.

How long does chlorine residual last?

24 hours
A free chlorine level of 0.5 mg/L of free chlorine will be enough residual to maintain the quality of water through the distribution network, but is most likely not adequate to maintain the quality of the water when this water is stored in the home in a bucket or jerry can for 24 hours.

How do you make a 0.5% chlorine solution?

Pour 1 part liquid bleach and 9 parts water into a bucket. Repeat until full. Store in shade. Do not store in direct sunlight.

How do you make a 0.05% chlorine solution?

To make a mild (0.05%) chlorine solution:

  1. Fill the bucket with 20 liters of water.
  2. Add 1 heaping tablespoon (1 tablespoon = 14 grams) of High Test Hypochlorite (HTH).
  3. Stir the solution with a stick.

How do you calculate chlorine percentage?

Finding the Concentration of a Solution For the example, assume the facility is using 100 pounds of chlorine per day. Divide the daily chlorine input by the MGD flow of the facility. In the example, the result would yield 33.33. Divide the result by 8.34 pounds per gallon to find the chlorine concentration.

What pH is best for chlorine?

between 7.2 and 7.8
A good chlorine level is between 1.0 and 4.0 parts per million (ppm), while the pH should be between 7.2 and 7.8. Together, they keep bad bacteria at bay: If pH goes up too high, chlorine’s germ-killing power deflates.

Does lowering pH increase chlorine?

With a pH level of 6.0 your chlorine will be highly effective with 97% of your chlorine available to kill bacteria and algae….How Does pH Effect Chlorine?

% Active HOCI (Hypochlorous Acid) pH
24 % 8.0
9 % 8.5