What is included in construction documents?

What is included in construction documents?

The Construction Documents contain contract forms, conditions of the contract, specifications, and drawings. Bidding requirements are also produced during this phase. Stringent contractor qualifications are delineated, ensuring that only contractors with a proven track record will be prequalified to bid.

What is the order of construction documents?

Drawings are always organized from most general to most specific or specialized. Since plans are most helpful to see the overall design of the project, they come first. Elevations and sections are a bit more specific and come next followed by details and schedules, which are the most specific type of drawings.

What are three types of construction documents?

Here are some of the most important construction documents for commercial projects:

  1. Bidding Documents.
  2. Construction Contractor Agreement.
  3. Architectural Drawings.
  4. Specifications.
  5. Bill of Quantities.
  6. Schedule.
  7. Work Orders.
  8. Subcontractor Application.

What are construction documents purpose?

CONSTRUCTION DOCUMENTATION Construction documents or CD sets, as they are often referred to, provide essential information for the building design and construction and serve the purpose of building permit application, bidding and construction contract administration.

What is a construction document set?

A set of construction documents is a set of drawings that an architect produces during the design development phase of a construction project. They serve as a project manual during the construction phase, and they assist permitting agencies and inspectors from local governments, who have to clear the project.

How do you organize construction documents?

How To Organize Your Construction Project Files: 6 Keys to Successful Document Management

  1. Earn buy-in with a centralized system.
  2. Organize a digital file structure.
  3. Create a workflow.
  4. Find someone to manage the system.
  5. Make documents accessible to key partners.

What is the final stage of construction called?

The Post-Construction/ Closeout Phase. The project closure phase of the project is the last step in the long process of designing and completing a construction project. Now that all the work on the job site has been completed, the project will come to a close.

Which documents are the most important for the construction process and why?

The drawings and building plans are the most important documents for your construction project.

What is construction project documentation?

Relevant documents may include contracts/agreements, plans and specifications, drawings, schedules, insurance policies/programs, notices, progress/inspection reports, draw requests and pay applications, change orders, permitting, code compliance and occupancy documentation, as well as communications.

What are the types of construction documents drawings?

12 types of construction drawings

  • Site plan. A site plan provides a map of the construction site.
  • Plot plans. Plot plans are like site plans in that they both depict the whole project site.
  • Excavation plans.
  • Floor plan.
  • Elevation drawings.
  • Section drawings.
  • Detail drawings.
  • Mechanical and electrical drawings.

What is document management in construction?

Construction document management is the general process that a construction manager or project manager might use to organize and store contracts, blueprints, permits, and other documents necessary to day-to-day operations.

What is construction site documentation?

Site documentation which forms your project information management system. Project documentation which forms the planning, contractual and legal documents required to conduct the project.

What is the difference between construction documents and contract documents?

based on my understanding, these two words are describing the same thing. If they are different, construction contract documents refer to the things prepared by the designer before the construction and project’s contract documents refer to something may add to the original document during the construction.

What are the contents of contract documents?

Contract document include sufficient information to be able to complete the work or service….

  • Contract Drawings and Specifications.
  • Priced Bill of Quantities.
  • Construction Programme.
  • Project Quality Management Plan.
  • Project Health and Safety Plan.
  • Conditions of Contract.
  • Risk Insurance.
  • October 31, 2022