What is a USACE 408 permit?

What is a USACE 408 permit?

Section 408 provides that USACE may grant permission for another party to alter a Civil Works project upon a determination that the alteration proposed will not be injurious to the public interest and will not impair the usefulness of the Civil Works project.

What is a 35% design?

Conceptual and Schematic Design (sometimes referred to as SDs or 35%): At this stage the design is only going to be a few pages. We should be ensuring the design is feasible and we are looking for value engineering opportunities.

What is a USACE Matoc?

The Renewable Energy Multiple Award Task Order Contract (MATOC) is a contract vehicle that establishes a pool of qualified firms/contractors for two renewable energy technologies to compete for individual task order contracts.

How long is EM 385 good for?

Technically speaking, EM 385 certification doesn’t expire. In other words, there’s no mandatory refresher period in the EM 385 regulations for most government contract workers. There are, however, official refresher or continuing education requirements for designated officers, like CDSOs and SSHOs.

What is a MACC contract?

The Multiple Award Construction Contract (MACC) is an Indefinite Delivery, Indefinite-Quantity (IDIQ) Contract for execution of a broad range of maintenance, repair and minor construction projects affecting real property at Kirtland Air Force Base, New Mexico.

What is a Satoc?

Single Award Task Order Contract (SATOC) When agencies use a SATOC for procuring construction projects, they solicit RFPs from contractors and award the contract to one vendor for multiple years. The agency then issues task orders to that sole provider to complete projects. SATOCs are often used by military branches.

What does EM 385 stand for?

Safety and Health Requirements Manual
EM-385 is the Safety and Health Requirements Manual that is published and updated by the US Corps of Engineers (USACE). It is mainly meant for DoD projects and violation of the terms of the manual can lead to a canceled contract.

What is the experience requirement for a site and safety health officer from EM 385-1-1?

SSHO Qualifications / Requirements First Aid and CPR Certified. Have Completed 40 Hour EM 385-1-1 Course. Have Completed 30 Hour OSHA Construction Course. Have 5 or more years of hands on construction safety experience as an SSHO.

What is 90% model review?

Objectives of 90% model review The main objectives of the 90% model are: To ensure that the final design is acceptable to the client and agree to IFC issues of all drawings and specifications. To ensure that operational and maintenance access has been provided to all required items.

What are DD drawings in construction?

“ – Design development, or DD, occurs after schematic design and right before construction documents. Assume the schematic design phase was a distant view into the building where you can see its shape and general outline.

What does MACC stand for in construction?

Multiple Award Construction Contract (MACC)

What is a saber contract?

A SABER contract is a specific type of contract which makes use of pre-defined project specifications and parameters. Unit pricing, profit coefficients, total project budget, and design percentage are all laid out ahead of time by the terms of a SABER contract.

What is the policy for USACE acceptance of work?

UAI 5107.102-100 Policy for USACE Acceptance of Work. Project managers (PMs) are responsible to ensure all projects are accepted in compliance with Engineering Regulation (ER) 5-1-9, Assignment and Transfer of Project Responsibilities; ER 5-1-10, Corps-wide Area of Work Responsibility; and ER 5-1-11, U.S. Army Corps of Engineers Business Process.

What is the implementation guidance for former USACE contracts?

IMPLEMENTATION GUIDANCE – FORMER USACE PROVISIONS AND CLAUSES 1 Implementation Guidance – Former USACE Local Provisions and Clauses 1. The Office of the Deputy Assistant Secretary of the Army (Procurement) (ODASA(P)) issued a directive effective 1 October 2017, that local clauses are no longer permitted in Army contracts.

What is a USACE construction contract?

FAR Clause 52.249-10, DEFAULT (Fixed-Price Construction): (1) USACE construction contracts provide either a completion date or a number of calendar days during which the contractor is to complete the work required by the contract.

What requirements does USACE enforce on USACE projects?

However, the Chief of Engineers has directed that USACE personnel will enforce only contract clauses and EM 385-1-1, Safety and Health Requirements, on USACE projects. b.

  • September 24, 2022