How much does building control cost London?

How much does building control cost London?

Full Plans charges

Estimated cost of work not exceeding Refurbs and Extensions Small Residential Alterations *
£40,000 Plan £391.20 Insp £586.80 Plan £514.00 Insp £771.00*
£70,000 Plan £529.20 Insp £793.80 Plan £652.00 Insp £978.00*
£100,000 Plan £621.20 Insp £931.80 Plan £698.00 Insp £1,047.00*

How much does building regs cost UK?

For Building Regulation drawings, expect to pay from around £700 for a single-storey extension, and around £1,200 for a two-storey extension, excluding additional charges for structural calculations, building control application fees and any party wall agreements.

What is a regularisation fee?

‘Regularisation charge’ is the charge payable when application is made to the local authority for a regularisation certificate in. respect of unauthorised building work, commenced on or after 11th November, 1985. Payment methods accepted include *, BAC’s and Credit/Debit card.

How much does a private building inspector cost UK?

As a rule of thumb, most conversion, renovation or extension work will cost around £100 to submit full plans and a further £200 -400 for inspections. Approved Inspection fees are usually similar in terms of a total charge – usually around 1-2% of the cost of the work.

Do I need building notice or full plans?

Building Notice Plans are not required initially, although it may be necessary to provide drawings and/or structural calculations later.

Is building control the same as building regs?

The difference between building regulations and building control is this; building regulations are the building standards, and building control is the function of enforcing those standards. It is the job of a Building Control Inspector to assess whether or not a project complies with building regulations.

What is building control regularisation?

If you make a change to or extend a building without approval it could cause problems when you come to sell it. ‘Regularisation’ is a way to get approval for work already done, by checking that the work is of a good standard. We can do this for building work done after 11 November 1985.

How much does a building inspector cost UK?

Do I have to use local authority building control?

The local authority has a general duty to see that building work complies with the building regulations, unless it is under the control of an approved inspector. Only local authorities have the power to enforce standards if things go wrong.

What is the difference between a building control officer and an approved inspector?

The term ‘building control officer’ generally (although not always) refers to an employee of the local authority, whereas ‘approved inspector’ is a private sector individual or organisation.

Is building notice the same as building control?

A Building Notice is a written notice that you intend to carry out building work and does not normally mean that you have to submit detailed drawings. More information may sometimes be requested by the Building Control Surveyor to ensure that your work is in line with the regulations.

Do I need building control approval before I start work?

It is necessary then to give the building control body two working days notice before commencing the works. It is permissible to begin works before approval has been received, however, if the works are subsequently found not to comply with the building regulations, they may have to be altered or removed.

Who is responsible for building control?

Whoever carries out the building work should be responsible for ensuring that the work is compliant with the Building Regulations. However, responsibility ultimately lies with the building owner, who may be served a notice if work doesn’t comply with the Building Regulations.

How much is a building regulations indemnity policy?

The cost of a building regulations indemnity insurance policy depends on the value of the property and the work that’s been carried out, but most policies don’t cost more than a few hundred pounds.

What is a building control completion certificate?

A completion certificate is then issued by the building control body (or a ‘final certificate’ if the building control body is an approved inspector – although this can be confusing as the term final certificate is also used in construction contracts to refer to completion of the works), providing formal evidence that …