Water curing, if properly carried out, can be the most efficient – and the most appropriate for some types of work, e.g. floors, and include ponding, sprinkling, and wet coverings. On flat surfaces such as pavements, footpaths, and floors, concrete can be cured by ponding.

How do you cure a concrete slab?

Moist curing is a common method of concrete curing. It involves wetting the concrete slab often with water (5-7 times per day) for the first 7 days. This method ensures your concrete slab will be extremely strong and durable, because it allows the moisture to evaporate slowly, preventing cracks and shrinks.

When should I start curing my concrete slab?

To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.

Should concrete be covered when curing?

Cover It Up It can protect the new concrete from environmental cooling and heating fluctuations as it cures, and it helps resist uneven curing due to rapid moisture loss at the top. Leave it covered for 24 hours.

Should you water concrete after it is poured?

Many construction specialists recommend watering it down five to ten times per day, for the first week, starting 2-4 hours after it has been poured. The first two to four hours lets the concrete “finish”, which refers to the setting process.

How cured is concrete after 10 days?

Moreover, according to IS-456, concrete curing should continue till it obtains 70% to 80% strength. The code also states that Ordinary Portland Cement needs to be cured for at least 7 days. The minimum curing period should be increased to 10 days if blended cement is used.

How long should fresh concrete be kept wet?

Concrete continues to gain strength after pouring for as long as it retains moisture, but the longer it moist-cures, the slower the rate of strength gain. Moist-curing concrete for 20 days more than doubles its strength compared to four days of moist-curing, which is considered a minimum.